Rigorous, professional, pragmatic, enthusiastic
One-stop global import logistics transportation service
Scan here
Follow us
13361086617
14/F, Wanping Business Building, Longao North Road, Lixia District, Jinan City, Shandong Province
Water Supply Chain Service Hotline
13361086617
A county-level municipal sewage treatment plant in northern Henan has a daily sewage treatment capacity of 40000 tons, and the aeration system in the plant is equipped with many large blowers. The original spare parts procurement mode of the factory is scattered off-line inquiry. The supply cycle of fan impellers, bearings, seals and other spare parts is as long as 15-25 days, and the specifications of spare parts from different manufacturers are not uniform. In 2025, there were many fan failures and shutdowns, and the shutdown of the aeration system led to excessive water output index, and the operation and maintenance cost of the factory continued to rise.